contact Construction Noise

 

 

engineer-inspecting

Engineer inspecting Sound Blankets 

lower water fountain area 

Engineers hanging Sound Blankets in the lower area of the Fountain area. These Sound Blankets were placed around the perimeter of the lower water Tower Construction area so University Classes can still be held..

lower-area-construction 

Construction progressing with Sound Blankets
on the perimeter wall


Recent Works